Official Gazette Notification Text
Official TranscriptInformation Note to the Press (Press Release No. 099/2026) TELECOM REGULATORY AUTHORITY OF INDIA www.trai.gov.in New Delhi, 20 July 2026 For Immediate Release TRAI Assesses Mobile Network Quality Across in Mumbai LSA. The Telecom Regulatory Authority of India (TRAI) has released findings of Independent Drive Test (IDT) conducted across Mumbai LSA, during the month of June 2026, for information of...
Information Note to the Press (Press Release No. 099/2026) TELECOM REGULATORY AUTHORITY OF INDIA www.trai.gov.in New Delhi, 20 July 2026 For Immediate Release TRAI Assesses Mobile Network Quality Across in Mumbai LSA.
The Telecom Regulatory Authority of India (TRAI) has released findings of Independent Drive Test (IDT) conducted across Mumbai LSA, during the month of June 2026, for information of general telecom consumers. The purpose of this drive test is to assess and verify real time quality of mobile network services (both voice & data) provided by Telecom Service Providers
(TSPs). During the IDT, TRAI captures performance of TSPs for key Quality of Service (QoS) parameters like Coverage, Call Drop Rate (CDR), Call Setup Success Rate (CSSR), data Download (DL) and Upload (UL) throughput etc., which are then published to inform Consumers and encourage TSPs to improve their services.
2. These IDTs have been designed to capture on ground mobile network performance of all TSPs across diverse usages environment like cities, hotspots, public transport hubs, etc. In this type of drive testing, live data and voice sessions are established using SIM cards from all TSPs over 2G, 3G, 4G, and 5G networks. Multiple advanced test handsets are used, and the sessions are monitored and analysed in real-time using advanced Software Systems.
3. TRAI, through its appointed agency, conducted drive tests across City drive - 204.3 Kms, Hotspot locations - 7 in Mumbai city during 10th June 2026 to 12th June 2026 in Mumbai LSA.
These tests were conducted under the supervision of the TRAI Regional Office Bengaluru. The observations presented in drive test reports represent the performance of the TSPs on the area/ route under test on the day/ time of conducting the drive test.
4. Drive Test Route Map: The following map provides overview of drive test routes indicating City drive, Inter-operator calling, Hotspots and Walk tests, as per the legends shown on
the map:-
5. Key Parameters Assessed a) Coverage Gap: Percentage of samples, for which signal strength observed less than the minimum prescribed signal strength for respective technology (2G/ 3G/ 4G/ 5G).
1b) Voice Services: Call Setup Success Rate (CSSR), Drop Call Rate (DCR), Call Setup Time, Call Silence Rate, Speech Quality (MOS). c) Call Silence Instance: Number of call silence instance occurred during the calls.
d) Data Servies: Download/ Upload Throughput, Latency, Jitter, Packet Drop Rate
6. The overall mobile network performance in Uttara Kannada District for the key parameters
has been summarised below:- a) Coverage Gap - The signal strength observed during voice testing on the drive test route in auto-selection mode (5G/4G/3G/2G), measured as the number of samples having poor signal strength out of the total samples collected, was 102/54857 for Airtel, 17877/23461 for MTNL, 144/54576 for RJIL and 5/54511 for VIL. Details of the coverage gaps have been provided in the map Annexed.
b) Dropped Calls - Dropped calls, measured as the number of dropped calls out of the number of successfully established calls, were 1/490 for Airtel, 28/203 for MTNL 0/489 for RJIL and 1/491 for VIL. Details of the dropped call locations have been provided in the map Annexed.
c) Call Silence Instance - Call silence instances, measured as the total number of silence instances observed for > 3 seconds out of the total calls established, were 14/ 481 for Airtel, Not Available for MTNL, 1/475 for RJIL and 1/479 for VIL. Details of the call silence instance locations have been provided in the map Annexed.
d) Data Download and Upload Throughput: i) Data Download performance (Overall): Average download speed was observed as 93.76 Mbps for Airtel (5G/4G), Not Available for MTNL , 237.81 Mbps for RJIL (5G/4G) and 70.69 Mbps for VIL (5G/4G/2G). Detail of Download throughput has been provided in the map Annexed.
ii) Data Upload performance (Overall): Average upload speed was observed as
25.92 Mbps for Airtel (5G/4G), Not Available for MTNL, 40.92 Mbps for RJIL (5G/4G) and 25.57 Mbps for VIL (5G/4G/2G). Detail of Upload throughput has been
provided in the map Annexed.
Locations of Dropped Calls and Call Silence instances can be seen by clicking red dot on the map Annexed.
7. Details of drive test route and area covered during the IDT is as under:- a) City - The areas covered in the city drive are Bandra Worli Sealink, Mahim, Dadar, Sion, Antop Hill, Worli, Parel, Sewri, Haji Ali, Mumbai Central, Byculla, Malabar Hill, Girgaon, Mazgaon and Churchgate etc in Mumbai city.
b) Hotspot - The hot spot locations, capturing stationary user experience, are Byculla Railway Station, Chhatrapati Shivaji Maharaj Terminus, Churchgate Railway Station, Dadar Railway Station, Gateway of India, Marine Drive, and Parel Railway Station.
8. The findings of this IDT report have been shared with respective TSPs for taking further necessary action at their end. Detailed reports of IDT are made available on the TRAI website at www.trai.gov.in. For any clarification or additional information, an email can be sent to adv.bengaluru@trai.gov.in or Regional Office of TRAI at Bengaluru RO can be contacted on telephone No. +91-80-22865004.
2Annexure
1. Mumbai LSA
2. Coverage Gap – The coverage distribution found less than the minimum specified signal strength for the drive test route in auto-selection mode (5G/4G/3G/2G) during voice testing,
is as below:
Parameter AIRTEL MTNL RJIL VIL Total Number of Samples captured on Drive test 54857 23461 54576 54511 route Number of Samples having poor signal strength 102 17877 144 5 Number of Samples having limited service (No 0 7325 0 0 Coverage)
Note: Signal strength has been considered poor if it falls below −110 dBm for 5G & 4G, −90 dBm for 3G, and −85 dBm for 2G.
Coverage Gap observed AIRTEL MTNL RJIL VIL
Note: Plot is based on Dynamic Drive Test results only.
3b) Dropped Calls - The TSP-wise details of dropped calls in auto-selection mode (5G/ 4G/ 3G/ 2G) are as below:
Parameter AIRTEL MTNL RJIL VIL Number of successful Calls Established 490 203 489 491 Number of dropped Calls 1 28 0 1 Locations of Dropped Calls AIRTEL MTNL VIL
Note: Dropped calls locations are shown in red colour and which can be clicked to know the exact location (latitude and longitude) on the map.
4c) Call Silence Instance - The TSP-wise details of Call silence instance in Auto-selection mode (5G/4G) are as below:
Parameter AIRTEL MTNL RJIL VIL Call Established 481 NA* 475 479 (within service provider network) Number of silences calls for >3 Sec 14 NA* 1 1 Total number of silence instances for >3 23 NA* 1 1 Sec * NA – Not Applicable Locations of Call Silence Instance AIRTEL RJIL VIL
Note: Call silence instances are shown in red colour and which can be clicked to know the exact location (latitude and longitude) on the map.
5d) Data Download and Upload throughput: The TSP-wise details of Average Download
(DL) and Upload (UL) throughput against declared typical DL/UL Throughput for month, in Auto-selection mode (5G/4G/3G/2G) are as below:
(i) Download Throughput AIRTEL MTNL RJIL VIL Measured Parameter (upto (upto (upto (upto in 5G) 3G) 5G ) 5G) Typical Download throughput declared by (Mbits/s) 7.37 2.86 15.00 15.00 TSP Average Download Throughput measured (Mbits/s) 93.76 - 237.81 70.69 during IDT AIRTEL RJIL VIL
Note: Plot is based on Dynamic Drive Test results only.
6(ii) Upload Throughput AIRTEL MTNL RJIL VIL Measured Parameter (upto (upto (upto (upto in 5G) 3G) 5G ) 5G) Typical upload throughput (Mbits/s) 2.08 0.25 7.00 8.00 declared by TSP Average Upload Throughput (Mbits/s) 25.92 - 40.92 25.57 m easured during IDT AIRTEL RJIL VIL
Note: Plot is based on Dynamic Drive Test results only.
7