Official Gazette Notification Text
Official TranscriptStatus: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 2025 No. 853 HIGHWAYS, ENGLAND The A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) (Variation) Order 2025 Made - - - - 14th July 2025 Coming into force - - 1st September 2025 The Secretary of State makes this Order in...
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
STATUTORY INSTRUMENTS 2025 No. 853 HIGHWAYS, ENGLAND The A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) (Variation) Order 2025 Made - - - - 14th July 2025 Coming into force - - 1st September 2025 The Secretary of State makes this Order in exercise of the powers conferred by sections 163(3)(d), 167(1)(a) and (2)(a), 168(1) and (2) and 171(1)(d) of the Transport Act 2000(1).
The Secretary of State has, in accordance with regulation 11(2) of the Trunk Road Charging Schemes (Bridges and Tunnels) (England) Procedure Regulations 2001(2), published notice of her intention to implement this variation.
Citation, commencement and extent
1.โ(1) This Order may be cited as the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) (Variation) Order 2025 and comes into force on 1st September 2025.
(2) This Order extends to England and Wales.
Variation of the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013
2.โ(1) Schedule 2 (charges payable under the first charging regime and the second charging regime) to the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013(3) is varied as follows.
(2) In column 4โ
(a) at item B, for โยฃ2.50โ substitute โยฃ3.50โ;
(b) at item C, for โยฃ3.00โ substitute โยฃ4.20โ;
(c) at item D, for โยฃ6.00โ substitute โยฃ8.40โ.
(1) 2000 c. 38; section 167(1)(a) was amended by the Infrastructure Act 2015 (c. 7), Schedule 1, paragraph 126. Section 168(2) was amended by the Local Transport Act 2008 (c. 26), Schedule 5, paragraph 4, the Local Democracy, Economic Development and Construction Act 2009 (c. 20), Schedule 6, paragraph 109, and the Levelling-up and Regeneration Act 2023 (c. 55), Schedule 4, paragraph 142. There are further amendments to sections 163, 167 and 171 which are not relevant to this Order.
(2) S.I. 2001/2303.
(3) S.I. 2013/2249, amended by S.I. 2020/126.Document Generated: 2025-09-01
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Signed by authority of the Secretary of State for Transport Lilian Greenwood Parliamentary Under Secretary for Transport 14th July 2025 Department for Transport 2Document Generated: 2025-09-01
Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
EXPLANATORY NOTE (This note is not part of the Order) This Order varies the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013 (โthe 2013 Orderโ), which introduced the current charging scheme in respect of the roads carried by the Dartford Crossing.
Article 2 of this Order increases the charges applicable under the free-flowing charging regime in the 2013 Order by 40%.
A full impact assessment has not been produced for this instrument as it amends provisions relating to a charge.
3