Whereas the Central Electricity Authority Flexible Operation of Coal based Thermal Generating Units Regulations, 2023 was notified by the Central Electricity Authority vide notification

Date: 18th December 2023
Category: Extra Ordinary
New Delhi

Read or download the official PDF of this gazette notification issued by the Central Electricity Authority on 18th December 2023. Classified under Extra Ordinary.

Official Gazette Notification Text

Official Transcript

रजिस्ट्री स.ं डी.एल.- 33004/99 REGD. No. D. L.-33004/99 सी.जी.-डी.एल.-अ.-18122023-250735 xxxGIDHxxx CG-DL-E-18122023-250735 xxxGIDExxx असाधारण EXTRAORDINARY भाग III—खण् ड 4 PART III—Section 4 प्राजधकार स ेप्रकाजित PUBLISHED BY AUTHORITY स.ं 834] नई दिल्ली, िुक्रिार, दिसम्ब र 15, 2023/अग्रहायण 24, 1945 No. 834] NEW DELHI, FRIDAY, DECEMBER 15, 2023/AGRAHAYANA 24, 1945 केंद्रीय जिद्यतु...

PolicyIndex Takeaway
Get AI summary →
  • Utilities can avail a maximum shutdown period of one month per unit for upgrades and retrofits.
  • Utilities should coordinate shutdown periods with their respective Regional Power Committees (RPCs) and align them with Annual Overhaul (AOH) periods where possible.
  • The notification specifies a five-phase implementation plan, including a pilot phase, for retrofitting and upgrading coal-based thermal power plants to enable flexible operation.
  • Phase I: July 2024 to June 2026, targets 91 units with a total capacity of 51,080 MW.
  • Phase II: July 2026 to June 2028, targets 100 units with a total capacity of 46,825 MW.